{
 "checked_date": "2026-11-09",
 "note": "Page labels and status for the missions in schedule.json. launched=false means the current NASA or JPL page read on checked_date lists the mission as upcoming. Selected coverage, not the full Moon Base mission inventory.",
 "missions": [
  {
   "id": "moon-base-i",
   "label": "Moon Base I",
   "description": "Blue Origin's Blue Moon Mark 1 lander, Endurance",
   "launched": false,
   "status_source": "https://www.nasa.gov/event/clps-flight-blue-origins-blue-moon-mark-1/"
  },
  {
   "id": "moon-base-ii",
   "label": "Moon Base II",
   "description": "Astrobotic's Griffin lander, now part of Voyager, carrying the FLIP rover",
   "launched": false,
   "status_source": "https://www.nasa.gov/event/clps-flight-astrobotics-griffin-mission-one/"
  },
  {
   "id": "moon-base-iii",
   "label": "Moon Base III",
   "description": "Intuitive Machines' IM-3 lander, Trinity, bound for Reiner Gamma rather than the south pole",
   "launched": false,
   "status_source": "https://www.nasa.gov/event/clps-flight-intuitive-machines-im-3/"
  },
  {
   "id": "moonfall",
   "label": "MoonFall",
   "description": "Four JPL-built drones carried by Firefly's Elytra spacecraft",
   "launched": false,
   "status_source": "https://www.jpl.nasa.gov/missions/moonfall/"
  },
  {
   "id": "promise",
   "label": "PROMISE",
   "description": "JPL rover with a radioisotope power source, delivered by Blue Origin",
   "launched": false,
   "status_source": "https://www.nasa.gov/mission/promise/"
  },
  {
   "id": "spacex-cislunar-comms-demo",
   "label": "Cislunar communications demo",
   "description": "SpaceX Starship deploying communications satellites",
   "launched": false,
   "status_source": "https://www.nasa.gov/news-release/nasa-awards-moon-base-transportation-technology-science-projects/"
  }
 ],
 "facts": [
  {
   "text": "PROMISE is a planned six-wheeled JPL rover with a drill designed to sample material from about 1 meter below the surface.",
   "url": "https://www.nasa.gov/news-release/nasa-awards-moon-base-transportation-technology-science-projects/",
   "link": "November 7 release"
  },
  {
   "text": "NASA plans a late-2028 launch and an 18-month primary mission.",
   "url": "https://www.nasa.gov/mission/promise/",
   "link": "PROMISE mission page"
  },
  {
   "text": "Its planned power source is an MMRTG, which makes electricity from the heat of radioactive decay; it is not a reactor.",
   "url": "https://science.nasa.gov/planetary-science/programs/radioisotope-power-systems/overview/",
   "link": "how NASA radioisotope power works"
  },
  {
   "text": "NASA announced $94 million in base work for Blue Origin to deliver it, with a further $140 million option that depends on performance.",
   "url": "https://www.nasa.gov/news-release/nasa-awards-moon-base-transportation-technology-science-projects/",
   "link": "November 7 release"
  },
  {
   "text": "MoonFall is planned to send four JPL-built propulsive drones aboard Firefly's Elytra spacecraft.",
   "url": "https://www.jpl.nasa.gov/missions/moonfall/",
   "link": "MoonFall mission page"
  },
  {
   "text": "NASA's May announcement targeted MoonFall's launch for 2028.",
   "url": "https://www.nasa.gov/news-release/nasa-provides-update-on-moon-base-rovers-landers-missions/",
   "link": "May 26 release"
  },
  {
   "text": "NASA also gave SpaceX a separate order to demonstrate deploying communications satellites from Starship into the space between Earth and the Moon in 2028, without disclosing its value.",
   "url": "https://www.nasa.gov/news-release/nasa-awards-moon-base-transportation-technology-science-projects/",
   "link": "November 7 release"
  }
 ],
 "published_date": "2026-11-09",
 "text": {
  "clps2_label": "CLPS 2 (new, 10 years)",
  "clps1_note": "New orders until November 2028, deliveries can finish by November 2033.",
  "nova_d_note": "It includes the March 27 Nova-D CLPS award, whose announcement describes CLPS and Artemis without naming Moon Base.",
  "matching_note": "June matches are worked out by us, not award numbers NASA published: we listed the orders under each company's CLPS parent contract and matched the company, the June 30 signing date, the number of deliveries and a combined value within $100,000 of NASA's figure.",
  "schedule_note": "A NASA podcast recorded on August 14 gave a tentative 2027 for Moon Base II, while later NASA articles and its event page say late 2026; both are listed. NASA's older CLPS deliveries page still shows a 2025 date for Griffin, which we treat as out of date. This table covers selected missions, not the whole Moon Base programme.",
  "speech_url_part": "moon-base-announcement-speech",
  "sources_targets": "Mission targets: NASA releases, articles, podcast and event pages, JPL mission pages, and Aerospace America for NASA statements of September 15, 2026.",
  "relationship_prefix": {
   "same_lander_operator": "",
   "japanese_parent_company_history_not_us_entity_flight": "Flown by the Japanese parent company, ispace. ",
   "acquired_predecessor_business_heritage": "Flown by Astrobotic before Voyager bought it. "
  },
  "sources_flights": "Flight grades: our <a href=\"/missions/moon/how-many-missions-to-the-moon/\">Moon mission ledger</a>, built twice independently and checked against NASA's NSSDCA and GCAT. Company links: NASA, Voyager and ispace announcements."
 }
}