This page separates announced values, optional work, shared contract ceilings and recorded obligations. It also shows the lunar lander flights linked to the companies NASA selected, and every mission target we found, statement by statement.
Located CLPS and Moon Base procurement announcements
An obligation is a government commitment to spend money; an outlay is a payment. The figures here are lifetime net obligations recorded by USAspending.gov when checked on November 9, 2026, including any reductions to earlier obligations. They aren't payments, spending in 2026 only, or a measure of how far a project has got.
This is an inventory of the NASA announcements we located from January 1, 2026 to November 9, 2026, not every procurement action, grant or science selection. It includes the March 27 Nova-D CLPS award, whose announcement describes CLPS and Artemis without naming Moon Base. Launch orders for Earth-orbit missions under the same VADR contract are left out.
| Announced | Programme | Company | For | Announced value | Option | Obligated so far | Source |
|---|---|---|---|---|---|---|---|
| March 27, 2026 | CLPS 1.0 | Intuitive Machines | Fifth CLPS delivery, Nova-D, lunar South Pole, NASA landing target 2030 | $180.4 million | - | $46.8 million | NASA (opens in a new tab) |
| May 26, 2026 | LTVS | Astrolab | Phase 1 High Achievability Mission task order for first-phase LTV | $219.0 million | - | $87.6 million | NASA (opens in a new tab) |
| May 26, 2026 | LTVS | Lunar Outpost | Phase 1 High Achievability Mission task order for first-phase LTV | $220.0 million | - | $121.0 million | NASA (opens in a new tab) |
| May 26, 2026 | CLPS 1.0 | Blue Origin | Two task orders to deliver Astrolab and Lunar Outpost LTVs to the lunar South Pole region | $188.0 million | $280.4 million | $101.5 million | NASA (opens in a new tab) |
| May 26, 2026 | MoonFall / Moon Base | Firefly Aerospace | Build the spacecraft transporting JPL MoonFall drones from Earth orbit to the Moon | not disclosed | - | not matched | NASA (opens in a new tab) |
| June 30, 2026 | CLPS 1.0 | Astrobotic | CS-8 lunar surface science deliveries, targeting late 2028 | $297.9 million | - | $48.3 million * | NASA (opens in a new tab) |
| June 30, 2026 | CLPS 1.0 | Firefly Aerospace | CS-8 lunar surface science deliveries, targeting late 2028 | $144.2 million | - | $31.3 million * | NASA (opens in a new tab) |
| June 30, 2026 | CLPS 1.0 | Intuitive Machines | CS-8 lunar surface science deliveries, targeting late 2028 | $148.3 million | - | $35.7 million * | NASA (opens in a new tab) |
| July 24, 2026 | Moon Base / CAPSTONE 02 | Advanced Space | Two-spacecraft cislunar technology demonstration | not disclosed | - | not matched | NASA (opens in a new tab) |
| September 30, 2026 | Moon Base communications | Modulate Space Corporation | 5G communications system with Wi-Fi 6, lab and lunar surface flight demonstrations | $38.0 million | - | not matched | NASA (opens in a new tab) |
| November 7, 2026 | PROMISE / CLPS | Blue Origin | Deliver PROMISE rover to lunar South Pole with Blue Moon Mark 1 | $94.0 million | $140.0 million | not matched | NASA (opens in a new tab) |
| November 7, 2026 | VADR | Arrow Science and Technology, Blue Origin, Impulse Space | Six launch and orbital transportation task orders supporting Moon Base cargo, CAPSTONE 02, MoonFall and cislunar demonstrations | $1.3 billion | - | not matched | NASA (opens in a new tab) |
| November 7, 2026 | Moon Base lunar logistics | SpaceX | Specialized Delivery Mission task order: Cislunar Communications Deployment Demonstration on Starship in 2028 | not disclosed | - | not matched | NASA (opens in a new tab) |
| November 7, 2026 | NextSTEP-3 B / miniCAST | Honeybee Robotics | miniCAST energy storage | not disclosed | - | not matched | NASA (opens in a new tab) |
| November 7, 2026 | NextSTEP-3 B / miniCAST | Redwire | miniCAST power generation | not disclosed | - | not matched | NASA (opens in a new tab) |
| November 7, 2026 | NextSTEP-3 B / miniCAST | Yank Technologies, Inc. | miniCAST wireless power transfer | not disclosed | - | not matched | NASA (opens in a new tab) |
"Not disclosed" means NASA gave no value; "not matched" means we couldn't tie the announcement to a federal record with confidence, not that nothing has been obligated. Where NASA gives one figure for several orders, we don't split it. * June matches are worked out by us, not award numbers NASA published: we listed the orders under each company's CLPS parent contract and matched the company, the June 30 signing date, the number of deliveries and a combined value within $100,000 of NASA's figure. Every obligation figure was checked against the signed transactions behind it, including negative ones. The CSV below links each figure to its USAspending.gov record.
Ceilings aren't awards
A ceiling is the most NASA can spend through a contract over its life. Companies still have to win individual orders under it.
| Contract | Who can win orders | Ceiling | What it means |
|---|---|---|---|
| CLPS 2 (new, 10 years) | Blue Origin, Firefly Aerospace, Intuitive Machines, ispace-U.S., Lockheed Martin Space, Northrop Grumman Space Systems, SpaceX, Voyager Technologies | $10 billion | Eligibility to compete for task orders. Not money awarded to any company. |
| CLPS (original contract) | Existing CLPS companies | $2.6 billion to $4.2 billion | Raised by $1.6 billion, 61.5 percent. New orders until November 2028, deliveries can finish by November 2033. |
| VADR launch and transport | All VADR companies | $5 billion | Maximum across all VADR contracts. The Moon Base orders announced on November 7, 2026 are $1.3 billion combined, shared by Arrow Science and Technology, Blue Origin, Impulse Space. |
Which companies have flown a lunar lander
2 of the 8 companies in the new contract, Firefly Aerospace and Intuitive Machines, have landed on the Moon with their own landers. 2 more, ispace-U.S. and Voyager Technologies, are linked to failed attempts by a parent company or a business they bought. For the other 4, Blue Origin, Lockheed Martin Space, Northrop Grumman Space Systems and SpaceX, our ledger has no lunar lander flight. Grades come from our Moon mission ledger and measure each mission against its own goals, so a lander that tipped over can still count as a success.
| Company | Mission | Launched | Our grade | What happened |
|---|---|---|---|---|
| Blue Origin | None matched | - | - | No historical lunar lander-operator mission matched in our ledger. This doesn't assess launch, manufacturing, subsystem or other experience. |
| Firefly Aerospace | Blue Ghost Mission 1 | 2025 | success | Operator reports all mission objectives met after full lunar-day surface operations. |
| Intuitive Machines | IM-1 | 2024 | success | Delivered instruments and returned surface data for the projected seven-day program despite tipped attitude. |
| Intuitive Machines | IM-2 | 2025 | partial | Tipped landing prevented drilling into regolith and mobile operations, but surface payload engineering tests returned data. |
| ispace-U.S. | HAKUTO-R Mission 1 | 2022 | failure | Flown by the Japanese parent company, ispace. Crash landing prevented the primary surface delivery and rover operations, despite completion of eight preparatory milestones. |
| ispace-U.S. | HAKUTO-R Mission 2 | 2025 | failure | Flown by the Japanese parent company, ispace. Crash landing prevented surface payload delivery and Tenacious deployment. |
| Lockheed Martin Space | None matched | - | - | No historical lunar lander-operator mission matched in our ledger. This doesn't assess launch, manufacturing, subsystem or other experience. |
| Northrop Grumman Space Systems | None matched | - | - | No historical lunar lander-operator mission matched in our ledger. This doesn't assess launch, manufacturing, subsystem or other experience. |
| SpaceX | None matched | - | - | No historical lunar lander-operator mission matched in our ledger. This doesn't assess launch, manufacturing, subsystem or other experience. |
| Voyager Technologies | Peregrine Mission One | 2024 | failure | Flown by Astrobotic before Voyager bought it. Propellant leak prevented lunar landing and surface delivery; spacecraft reentered Earth atmosphere. |
NASA mission targets, statement by statement
These are the target statements we located from May 26, 2026 to November 9, 2026, grouped by mission. Launch, arrival, landing and general mission timing are kept apart, and vague dates stay vague: we don't turn approximate targets into a number of months late. Years in brackets clarify relative wording. Current pages are what the page said when we read it, not evidence of when a target changed.
| Mission | Said on | Event | Target as stated | Source |
|---|---|---|---|---|
| Moon Base I | May 26, 2026 | Launch | no earlier than fall 2026 | NASA (opens in a new tab) |
| Moon Base I | May 26, 2026 remarks; May 27, 2026 published | Launch | Fall 2026, no earlier than | NASA (opens in a new tab) |
| Moon Base I | September 15, 2026 | Launch | the first part of 2027 | Aerospace America (NASA official quoted) (opens in a new tab) |
| Moon Base I | Current page, read November 9, 2026 | Launch | 2027 | NASA (opens in a new tab) |
| Moon Base II | May 26, 2026 | Launch | later this year [2026] | NASA (opens in a new tab) |
| Moon Base II | May 26, 2026 remarks; May 27, 2026 published | Launch | before the end of 2026 | NASA (opens in a new tab) |
| Moon Base II | August 4, 2026 | Launch | late 2026 | NASA (opens in a new tab) |
| Moon Base II | August 14, 2026 recorded; September 11, 2026 published | Mission / delivery, not explicitly a launch date | perhaps next year [2027] | NASA (opens in a new tab) |
| Moon Base II | September 15, 2026 | Launch | no earlier than November [2026] | Aerospace America (NASA official quoted) (opens in a new tab) |
| Moon Base II | October 13, 2026 | Launch | later this year [2026] | NASA (opens in a new tab) |
| Moon Base II | October 20, 2026 | Launch | late 2026 | NASA (opens in a new tab) |
| Moon Base II | Current page, read November 9, 2026 | Launch | Late 2026 | NASA (opens in a new tab) |
| Moon Base III | May 26, 2026 | Launch | this year [2026] | NASA (opens in a new tab) |
| Moon Base III | May 26, 2026 remarks; May 27, 2026 published | Launch | before the end of 2026 | NASA (opens in a new tab) |
| Moon Base III | September 15, 2026 | Launch | the first part of 2027 | Aerospace America (NASA official quoted) (opens in a new tab) |
| Moon Base III | Current page, read November 9, 2026 | Launch | Early 2027 | NASA (opens in a new tab) |
| MoonFall | May 26, 2026 | Launch | 2028 | NASA (opens in a new tab) |
| MoonFall | October 21, 2026 | Landing | 2028 | NASA (opens in a new tab) |
| MoonFall | Current page, read November 9, 2026 | Arrival | 2028 | NASA (opens in a new tab) |
| MoonFall | Current page, read November 9, 2026 | Landing | by 2028 | NASA (opens in a new tab) |
| PROMISE | November 7, 2026 | Launch | late 2028 | NASA (opens in a new tab) |
| PROMISE | Current page, read November 9, 2026 | Launch | late 2028 | NASA (opens in a new tab) |
| Cislunar communications demo | November 7, 2026 | Launch | 2028 | NASA (opens in a new tab) |
Moon Base I is Blue Origin's Blue Moon Mark 1 lander, Endurance. Moon Base II is Astrobotic's Griffin lander, now part of Voyager, carrying the FLIP rover. Moon Base III is Intuitive Machines' IM-3 lander, Trinity, bound for Reiner Gamma rather than the south pole. A NASA podcast recorded on August 14 gave a tentative 2027 for Moon Base II, while later NASA articles and its event page say late 2026; both are listed. NASA's older CLPS deliveries page still shows a 2025 date for Griffin, which we treat as out of date. This table covers selected missions, not the whole Moon Base program.
PROMISE, MoonFall and the SpaceX demonstration
PROMISE is a planned six-wheeled JPL rover with a drill designed to sample material from about 1 meter below the surface. (November 7 release (opens in a new tab)) NASA plans a late-2028 launch and an 18-month primary mission. (PROMISE mission page (opens in a new tab)) Its planned power source is an MMRTG, which makes electricity from the heat of radioactive decay; it isn't a reactor. (how NASA radioisotope power works (opens in a new tab)) NASA announced $94 million in base work for Blue Origin to deliver it, with a further $140 million option that depends on performance. (November 7 release (opens in a new tab)) MoonFall is planned to send four JPL-built propulsive drones aboard Firefly's Elytra spacecraft. (MoonFall mission page (opens in a new tab)) NASA's May announcement targeted MoonFall's launch for 2028. (May 26 release (opens in a new tab)) NASA also gave SpaceX a separate order to demonstrate deploying communications satellites from Starship into the space between Earth and the Moon in 2028, without disclosing its value. (November 7 release (opens in a new tab))
Missions to the MoonEvery launch, graded.
Moon missions that failedWhat went wrong, and when.
Every Moon landingCrewed and robotic, with sites.Cite this page
Space Osmosis. "NASA Moon Base contracts: awards, flights and schedules." https://spaceosmosis.com/missions/moon/nasa-moon-base-contracts/. Updated November 9, 2026. Accessed November 18, 2026 (the date this page was built; use the date you read it).
Reuse original charts, tables and figures, including commercially, with credit to Space Osmosis. An online source link is appreciated. Photos and third-party data keep their own licences. Reuse details.